Iberpadel Usa

 

 

Metal Structure

 

  • Twenty-six galvanized steel supports (4”x 2”x 1/16”) or (100 x 50 x 2 mm).

Steel supports are used to support glass panels. The steel supports have a base plate to anchor to concrete measuring (8” x 12” x ½”) or (200 x 300 x 10mm). The base of the supports flair out at an angle for additional support. The base plates have four holes drilled at ½” or 16mm in diameter.

 

 

  • Four galvanized steel support pillars for the four corners of the court (4”x 2”x 1/16”) or

(100 x 50 x 2 mm). The base of the supports flair out at an angle for additional support. The galvanized steel base plates for the supports measure (14” x 14” x ½”) or (350 x 350 x 10 mm). The base plates have five holes drilled at ½” or 16mm in diameter.

 

  • Twelve galvanized rectangular steel frames. Each rectangular frame measures (6’ 6” x 9’-101/8”) or (1950 x 3000mm). The tubular galvanized steel which makes up the frames measure

(1.50” x 1.50” x 1/16”) or ” (40 x 40 x 2mm). These frames have an over lay of wire mesh which are electro-welded onto the rectangular tubular supports. The wire mesh is welded in such a way for the squares to measure (2” x 2” x ¼”) or (50 x 50 x 5mm) which is regulation. Each rectangular frame comes with pre-drilled holes which match perfectly for assembly.

 

  • Eighteen galvanized rectangular steel frames that are assembled above the glass panels and attached to the metal frames supporting glass panels.   The eighteen frames measure

(6’ 6” x 3’-33/8”) or (1950 x 1000mm). The tubular galvanized steel which makes up the frames measure (1.50” x 1.50” x 1/16”) or (40 x 40 x 2mm). These frames have an over lay of wire mesh which are electro-welded onto the rectangular tubular supports. The wire mesh is welded in such a way for the squares to measure (2”x 2” x 1/8”) or (50 x 50 x 4mm) which is regulation.

 

Hardware for installation of Structure

 

  • Anchor bolts, model HST-R, Thickness ½” or 14mm, length 5.70” or 145mm at the base
  • 10 DIN 931 metric screws in A-2 stainless steel self-locking for structural unity



Treatment Process and Thermosetting Covering

 

This cleaning of the steel process degreases using three washes. The first two washes are free of phosphates (ST 609) and a final wash in reverse osmosis water in order to obtain a perfectly prepared surface ready for the specified coating of paint RAL.6005 with a matt or gloss finish.

The multi-metal ST 609 zetacoat process is a phosphate free product that applies layers on a large scale and approved for multi-metal applications on iron, aluminum, thermo/electro galvanized steel and zamack in immersion facilities. This immersion treatment provides excellent resistance to corrosion.

Treatment process and thermosetting covering:

Phase one. Degrease

Phase two. Wash with reverse osmosis water

Phase three.   Wash with reverse osmosis water

Phase four. Wash with reverse osmosis water

Phase five. Passive Surtec 609 (NANOCERAMICO)

Phase six. Wash with reverse osmosis water

Phase seven. Drying in a humidity tunnel with a temp. of 145 0C or 293 0F

Phase eight. Reduction of the electrostatic covering with RAL POLYESTER, between 80-100 microns.

Phase nine. Polymerization tunnel at a temperature between 200-300 0C or 392-572 0 F depending on the metal thickness.



Tempered Glass specifications:


  • Fourteen panels 2 x 3m x 10mm or 6’-63/4” x 9’-101/8” x3/4”
  • Four panels 2 x 2m x 10mm or 6’-63/4” x 6’-63/4” x3/4”